    EmployerBekaş
    Work Location Ankara, Türkiye
    Total Area 75.000 m2
    Start Date ..2017
    Completion Date ..2018
    Çiğdem, which is one of the oldest districts of Ankara where the project land is located, draws attention as a region which is away from the chaos of the city but not detached from the center. As one of the rare neighborhoods where neighborhood culture still continues, it is the first choice of many people who want to have qualified housing. The project was carried out to create a livable environment and a healthy building stock thanks to the establishment of flexible relations between Ankara climate, its nature, employer demands, user needs, land, environmental data, architectural elements and materials, architect-engineer requests for participation in various scales of the projec and many such inputs.

    Located in a dense green texture the project,while aiming to preserve the existing green integrity to give a positive value to the city and to create a qualified natural environment, focuses on the user with its functional interior solutions. The land surrounded by the Hacettepe forests and the METU forests, which we can call the green heart of Ankara city center, offers the user a unique visual experience by  evaluating the Söğütözü landscape as an important input in the design.

    Designed as 4 separate blocks, including basement, ground floor and 15 residential floors, the project has a height of 51.40 m. There are 377 flats in the project that is consists of 3 + 1 flats with a net area of 138 m² / 125 m² and 2 + 1 flats with a net area of 65,00 m² /80.00 m². According to the requirements of the user even after the application, the user is allowed to re-interpret and personalize the spaces with plans that give flexibility to variations like 4+1 and 5+1. As well as allowing changes that can meet the user's quantitative expectations, the stipulated modularity has been produced / derived from the themes of production-space-belonging. The gridal arrangement constructed on the facade allows the space behind it to be perceived to be independent of the function and adds movement to the facade by within rhythmic windows. The horizontal / vertical emphasis and full / empty systematic of the masses are also seen in this gridal order. The geometry of the structure is clarified with the white / gray / red contrasts used in the facade.

    The positioning of the blocks in the terrain which four sides surrounded by park, has been functionalized and a scenario that allows more green and social areas has been created. Each flat in the blocks, which are positioned so as not to interrupt each other's view and light, makes maximum use of daylight and landscape.

    The proposed green courtyard among the blocks positioned in accordance with the topography serves as a public area for the city. The continuity and permeability of access was ensured with the arrangements related to general and private uses were physically related. The green area between the blocks that maintain the continuity of the surrounding green system is supported by the water, as an element that is arranged in different levels in harmony with the slope of the land, providing separator and visual richness.

    It is aimed to establish permanent bonds with rational solutions between today's technological, social and economic reality in many subject such as settlement form, the combination of housing blocks and housing units, interior solutions of residences, open and closed area arrangements, architectural design, architectural material and detailing.